DESIGN & CONSTRUCTION OF BELTAG WASTEWATER TREATMENT PLANT (UNDER CONSTRUCTION)

DESIGN & CONSTRUCTION OF BELTAG WASTEWATER TREATMENT PLANT (UNDER CONSTRUCTION)

Gharbia - Egypt

Client: Gharbia Water & Wastewater Company
Connection of the two force mains including flow measurement and valve chambers.

Automatically driven mechanical screening units, one manual screen & two aerated grit/grease removal channels with associated air blower house.

The automatic screens will be equipped with a screening’s washer and compacter, the grit channels will be equipped with a grit washing and classifying unit.

Grease chamber as well as the delivery of containers for screenings and grit.

Selector tank with mechanical mixers, Aeration tanks, final clarifiers with floating sludge collection chamber.

Chlorine contact tank with associated chlorination house, chlorine drum storage facility, chlorination rooms, motive water pumps, and an area monitoring center.

Excess sludge pumping station, sludge thickeners.

Sludge holding tank with coarse bubble aeration. One thickened sludge pumping station.

Centrifugal decanters with associated polymer preparation and dosing unit

One sludge storage area for temporary storage.

Administration and laboratory buildings, monitoring center, furniture and building electrical. Workshop, stores with gantry crane, furniture and building. Internal roads, brick wall and gate.